top of page
Concepts
The Preferred Concept for the redesign of the Inner Loop North corridor appears below. It will be further analyzed and refined during the design phase. The Preferred Concept was developed based on extensive community input and technical evaluation as well as the earlier Draft Concepts (June 2021) shown below.
Draft Concepts
bottom of page